
Preparation and Development of Ruhezamyenda Catchment Management Plan
This project was predominantly catchment based IWRM problem analysis through stakeholder consultations that led to the synthesis of the visions generated by stakeholders at the sub catchment level during the search for sustainable interventions.

Environmental and Social Impact Assessment (ESIA) for the Proposed Construction of a Robusta Coffee Washing Station in Nkonkonjeru Town Council
The assignment sought to assess the potential impact of the proposed project on the biophysical and socio-economic environment. It entailed consultations with potentially affected persons …

Preparation and Development of Ruhezamyenda Catchment Management Plan
This project was predominantly catchment based IWRM problem analysis through stakeholder consultations that led to the synthesis of the visions generated by stakeholders at the sub catchment level during the search for sustainable
